Robert & Barbara's
Hammersley Rd
house in Madison
While Barbara was in Italy with Casey, Ian and Layla, replacement of our asphalt driveway with concrete was begun on 5/27/25. A cut parallel to the flower boxes allowed the asphalt beneath them to be retained.
![]() |